• Planning and build in one team
  • Courts to the LTA specification
  • UK-wide

Call: 0333 772 0141

Rocket Padel glazed padel hall in front of Battersea Power Station chimneys

Services

Padel Court and Padel Club Services

One outdoor floodlit courtabout £71,000ex VAT and fees (LTA, 2025); most projects £60,000 to £270,000

Tell us where you are up to. We reply within one working day with the planning route and a written quote.

  • 2named leads: Sam Guest for planning, Alex Winser for the build
  • 6covered courts applied for at Old Blues RFC, Merton
  • 1team from the first drawing to handover
  • UKwide, for clubs, operators, councils and schools
Sam GuestAlex Winser

Sam Guest Compliance and client lead
Alex Winser Delivery and project lead
Read more about Sam and Alex

Last updated October 2026

One team for the whole padel scheme: the courts and their base, the planning application, the architecture, and the energy, overheating, carbon and BREEAM reports a council asks for when there is a clubhouse. LTA figures from 2025 put one outdoor floodlit court, base included, at about £71,000 ex VAT and fees; the planning and sustainability work is quoted for your site.

Planning and design

Energy, carbon and BREEAM (SustainPlan)

How it works

  1. 01Tell us where you are up toSite, drawings and any council letters.
  2. 02Planning routePre-app, the reports and the application.
  3. 03BuildBase, courts and lights to the approved layout.

Court build

Which services does my scheme need?

It depends on what you are building. Open outdoor courts usually need planning with noise and lighting evidence. Add a clubhouse or an enclosed hall and the council will also want energy and overheating evidence, plus whole life carbon on London referable schemes and BREEAM where the local plan names a rating. The common snags are set out on padel planning problems we solve.

Who does the work

Padel Court Build is a SustainPlan Ltd service. See who we work with for the roles in the team.

Get a quote

Tell us about the job

Tell us where you are up to. We reply within one working day with the planning route and a written quote.

  • Tell us where you are up to. Site, drawings and any council letters.
  • Planning route. Pre-app, the reports and the application.
  • Build. Base, courts and lights to the approved layout.

Sam GuestAlex Winser

Sam and Alex oversee every job: Sam runs operations and compliance, Alex runs the work on the ground. Read more about Sam and Alex

Prefer to talk? 0333 772 0141

Email us

SustainPlan LtdRegistered in England and Wales, company number 17085854.
Registered office:
71-75 Shelton Street
Covent Garden
London
WC2H 9JQ

Get your fixed priceTakes about two minutes
1What do you need?

2How soon do you need it?

3Your details

Need anything else? Add it to the same quote (optional)
You will probably also need(tick any that apply)

Need something not listed? Tell us in the box below. Through the businesses we run, we can usually help or point you to the right people.

Add notes, photos or drawings (optional)

Planning drawings, site plan or any council letters or conditions (optional)

PDF, JPG, PNG, HEIC or DWG, up to 5 MB each, up to 3 files

Not got one? No problem, we can work from photos or a quick visit.

We use your details only to reply to this enquiry. Privacy and cookies